Should I go composite or wood?
For most Calgary homeowners, composite. Wood looks beautiful for the first few years and then asks for an annual maintenance commitment that almost nobody actually keeps. Composite delivers the look without the maintenance, holds up to Calgary’s freeze-thaw, and carries a longer warranty than wood ever will. Where wood is the right call (heritage homes, specific design intents), we use the right wood and detail it to last.
How long does a deck project take?
Most residential decks take 2 to 4 weeks of active build time depending on size, structure, and any covered or roof-extension scope. Permits and design add lead time on the front end. We give you a realistic timeline with weather buffers baked in.
Do you build outdoor kitchens and pergolas?
Yes. Pergolas, covered roof extensions, outdoor kitchen prep, outdoor heating and lighting integration. Anything that turns the deck from a surface into a room. We’re conservative about scope: if it doesn’t earn its place in how you’ll actually use the space, we’ll say so.
Can you replace railings without redoing the whole deck?
Often yes. Old wood railings on a sound deck structure can be replaced with aluminum or glass systems in a few days, and the upgrade in look and longevity is significant. We’ll inspect the existing structure during the consultation and tell you whether the deck has enough life left to justify the new railing on top of it.
What about Calgary’s snow load? Are covered structures safe?
Yes, when they’re engineered for it. Covered structures and outdoor rooms have to be designed and built to Alberta’s structural code for snow loading. We don’t cut that corner. Every covered build is engineered, permitted, and inspected to handle a Calgary winter.
Will my deck be ready for summer if I start in spring?
Calgary’s build window is short. Booked early enough, yes. The earlier you start the design and quote conversation in the winter, the more likely your deck is finished by the first long weekend. Late-season starts (July or after) usually push completion into the fall.